Research Article

The Effect of Excavation Disturbance on the Stability of Bedding Cataclastic Rock Mass High Slope Containing Multimuddy Interlayers

Figure 12

Maximum principal stress plot for Model Ⅰ 2nd calculation scheme. (a) Step 8 after excavation. (b) Step 13 after excavation. (c) Step 15 after excavation. (d) Step 21 after excavation. (e) Step 25 after excavation. (f) Step 26 after excavation.
(a)
(b)
(c)
(d)
(e)
(f)