Research Article

Analyzing the Variances in Perspectives on BIM Implementation among Korea AEC Participants

Table 9

Statistics and P-value from the Dunn test by Q3.

Q3(Q10-a) Design review(Q10-e) Preconstruction(Q14-b) Specialized CDE solution(Q23) Need for postexecution review
Zadj. PZadj. PZadj. PZadj. P

Opr:Ctr0.1381.0000.2421.000−1.0901.0002.1280.167
Opr:D&S−1.3770.843−0.9461.0000.0801.0001.2121.000
Opr:BSP0.5301.0001.9070.2831.4130.789−0.3611.000
Opr:ect.−0.9541.0000.2881.000−1.2621.000−2.5500.054
D&S:Ctr−1.7610.391−1.3660.8601.2501.000−0.7541.000
D&S:BSP1.0791.000−0.8971.000−1.5960.552−1.0381.000
D&S:ect.−2.7450.030−0.8781.000−1.2491.000−1.0781.000
Ctr:BSP0.8281.0002.6570.0390.3771.0002.1530.157
Ctr:ect.−1.0211.0000.6891.000−3.0590.0111−0.3311.000
BSP:ect.−1.9610.249−2.2160.134−3.5610.0018−2.7300.032

The underlined number represents a p-value below the significance level of 0.1, and the bold underlined number represents a p-value below the significance level of 0.05.