Analyzing the Variances in Perspectives on BIM Implementation among Korea AEC Participants
Table 9
Statistics and P-value from the Dunn test by Q3.
Q3
(Q10-a) Design review
(Q10-e) Preconstruction
(Q14-b) Specialized CDE solution
(Q23) Need for postexecution review
Z
adj. P
Z
adj. P
Z
adj. P
Z
adj. P
Opr:Ctr
0.138
1.000
0.242
1.000
−1.090
1.000
2.128
0.167
Opr:D&S
−1.377
0.843
−0.946
1.000
0.080
1.000
1.212
1.000
Opr:BSP
0.530
1.000
1.907
0.283
1.413
0.789
−0.361
1.000
Opr:ect.
−0.954
1.000
0.288
1.000
−1.262
1.000
−2.550
0.054
D&S:Ctr
−1.761
0.391
−1.366
0.860
1.250
1.000
−0.754
1.000
D&S:BSP
1.079
1.000
−0.897
1.000
−1.596
0.552
−1.038
1.000
D&S:ect.
−2.745
0.030
−0.878
1.000
−1.249
1.000
−1.078
1.000
Ctr:BSP
0.828
1.000
2.657
0.039
0.377
1.000
2.153
0.157
Ctr:ect.
−1.021
1.000
0.689
1.000
−3.059
0.0111
−0.331
1.000
BSP:ect.
−1.961
0.249
−2.216
0.134
−3.561
0.0018
−2.730
0.032
The underlined number represents a p-value below the significance level of 0.1, and the bold underlined number represents a p-value below the significance level of 0.05.