Research Article

Evaluation of Long-Term Wastewater Treatment Performances in Multi-Soil-Layering Systems in Small Rural Communities

Table 2

Mass balances of BOD, COD, T-N, and T-P from July 2012 to June 2013.

IndexBODCODT-NT-P
SITE 1SITE 2SITE 3SITE 1SITE 2SITE 3SITE 1SITE 2SITE 3SITE 1SITE 2SITE 3

Total load (from wastewater)159.1 (100)172.4 (100)223.5 (100)363.3 (100)330.9 (100)427.5 (100)77.6 (100)63.0 (100)113.8 (100)10.5 (100)6.6 (100)11.7 (100)
Removal in BCAE75.6 (48)125.0 (72)171.9 (77)196.0 (54)216.5 (65)286.0 (67)15.8 (20)13.1 (21)19.9 (17)3.0 (29)0.6 (9)1.8 (16)
Discharge from BCAE83.5 (52)47.4 (28)51.7 (23)167.3 (46)114.4 (35)141.5 (33)61.7 (80)49.8 (79)93.9 (83)7.4 (71)6.1 (91)9.8 (84)
Discharge into river from BCAE (Nov–Apr)34.3 (22)13.5 (8)76.3 (21)39.8 (12)24.5 (32)17.2 (27)2.7 (26)2.1 (31)
Load into MSL49.2 (31)33.9 (20)51.7 (23)91.1 (25)74.6 (23)141.5 (33)37.3 (48)32.6 (52)93.9 (83)4.7 (45)4.0 (60)9.8 (84)
Load per unit area in MSL (g·m−2)248.0243.5299.5459.3535.8819.6188.0234.1543.923.728.756.8
Removal in MSL40.6 (26)31.2 (18)49.3 (22)71.8 (20)57.8 (18)121.3 (28)19.4 (25)24.1 (38)88.4 (78)3.7 (36)1.4 (21)9.1 (78)
Removal rate in MSL (%)a82.492.095.378.877.585.852.273.894.280.035.293.0
Discharge from MSL8.6 (5)2.7 (2)2.4 (1)19.3 (5)16.8 (5)20.2 (5)17.8 (23)8.5 (14)5.5 (5)0.9 (9)2.6 (39)0.7 (6)
Total discharge42.9 (27)16.2 (9)2.4 (1)95.6 (26)56.5 (17)20.2 (5)42.3 (55)25.8 (41)5.5 (5)3.7 (35)4.7 (70)0.7 (6)

Unit = kg (the data in parenthesis are expressed as relative values to total loading amount from wastewater (%)). aRemoval rate in MSL (%) = removal in MSL/load into MSL from BCAE × 100.