Research Article

Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings

Table 1

Comparison between assembled and traditional constructions.

Construction sessionAssembled constructionTraditional construction

DesignInformation-based collaborative designIndependent design for each department

ConstructionFactory production, professional lifting, and fine installationManual handling on-site

ManagementGeneral contracting management modeEach participant seeks to maximize their own interests

DecorationIntegrated design and simultaneous installation with the main structureSecondary decoration