Research Article
Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings
Table 1
Comparison between assembled and traditional constructions.
| Construction session | Assembled construction | Traditional construction |
| Design | Information-based collaborative design | Independent design for each department |
| Construction | Factory production, professional lifting, and fine installation | Manual handling on-site |
| Management | General contracting management mode | Each participant seeks to maximize their own interests |
| Decoration | Integrated design and simultaneous installation with the main structure | Secondary decoration |
|
|