[Retracted] Construction of Personalized Learning Platform Based on Intelligent Algorithm in the Context of Industry Education Integration
Table 6
Analysis of physical security test results.
Test number
Test content
Test phenomenon
Result
01
Unexpected power failure of the server, including the disconnection of the standby power supply
The system stops working and returns to normal operation after power on
After 50 tests, the server can run normally and save data well
02
Disconnect the hard disk module of the server and see if the system can process the old data and restore it
After inserting and unplugging some hard disks, the system can restore the affected data from the backup process to ensure the normal operation of the system
Five hard drive modules are tested for normal backup and restore operations and meet design standards