Research Article

Intelligent Identification and Construction System of Prefabricated Tunnel Structure Based on BIM Technology

Table 1

Core connotation of prefabricated buildings.

ContentTraditional construction methodFabricated construction method

Design phaseDisconnection between design, production, and constructionIntegrated and information-based collaborative design
Construction stageWet operation and manual operation on-siteAssembly, specialization, refinement, and mechanization
Decoration stageBlank room and secondary decorationThe decoration is synchronized with the main structure
Acceptance phaseDivisional and itemized sampling inspectionWhole process quality control
Management phaseFocus on labor subcontracting of migrant workers and pursue their own interestsEPC management pursues the maximization of overall benefits in the whole process