Research Article
Performance Evaluation of Cement-Stabilized Oil Shale Semicoke as Base or Subbase Course Construction Material
Table 9
UCS standard at 7 days for cement-stabilized materials.
| Structure layers | Highway grade | Very heavy traffic (MPa) | Heavy traffic (MPa) | Medium and light traffic (MPa) |
| Base course | Freeway, class 1 highway | 5.0–7.0 | 4.0–6.0 | 3.0–5.0 | Class 2 and below highway | 4.0–6.0 | 3.0–5.0 | 2.0–4.0 |
| Subbase course | Freeway, class 1 highway | 2.5–4.5 | 2.5–4.5 | 2.0–4.0 | Class 2 and below highway | 2.0–4.0 | 2.0–4.0 | 1.0–3.0 |
|
|