Research Article
Investigation and Analysis on Crystallization of Tunnel Drainage Pipes in Chongqing
Table 1
Statistics of crystallization surveys on some tunnels under construction in Chongqing.
| Projects | Number of locations | Crystallization (%) | Groundwater (%) | Crystallization | Groundwater | No groundwater | Total |
| Tunnel between Chongqing North Railway Station and Yulu Station | 72 | 82 | 10 | 92 | 78.3 | 89.1 | Right tunnel between Danzishi Station and Tushan Station | 42 | 48 | 22 | 70 | 60.0 | 68.6 | Left tunnel between Danzishi Station and Tushan Station | 28 | 37 | 2 | 39 | 71.8 | 94.9 | Tunnel between Wutong Road Station and Wulidian Station | 60 | 14 | 61 | 75 | 80.0 | 18.7 | Tunnel between Min’an Avenue Station and Chongqing North Railway Station | 8 | 14 | 6 | 20 | 40.0 | 70.0 | Right tunnel of New Zhongliang Mountain | 9 | 2 | 8 | 10 | 90.0 | 20.0 | Left tunnel of New Zhongliang Mountain | 14 | 14 | 16 | 30 | 46.7 | 46.7 | Total | 233 | 211 | 125 | 336 | 69.3 | 62.8 |
|
|
Note: all data in Table 1 only reflect the states when the sites were surveying. |