Research Article

Investigation and Analysis on Crystallization of Tunnel Drainage Pipes in Chongqing

Table 1

Statistics of crystallization surveys on some tunnels under construction in Chongqing.

ProjectsNumber of locationsCrystallization (%)Groundwater (%)
CrystallizationGroundwaterNo groundwaterTotal

Tunnel between Chongqing North Railway Station and Yulu Station7282109278.389.1
Right tunnel between Danzishi Station and Tushan Station4248227060.068.6
Left tunnel between Danzishi Station and Tushan Station283723971.894.9
Tunnel between Wutong Road Station and Wulidian Station6014617580.018.7
Tunnel between Min’an Avenue Station and Chongqing North Railway Station81462040.070.0
Right tunnel of New Zhongliang Mountain9281090.020.0
Left tunnel of New Zhongliang Mountain1414163046.746.7
Total23321112533669.362.8

Note: all data in Table 1 only reflect the states when the sites were surveying.