Research Article
Study on the Life-Cycle Health Monitoring Technology of Water-Rich Loess Tunnel
Figure 4
The distributed optical fiber installation flowchart: (a) carving slot and routing on the sidewall, (b) carving slot and routing on the crown, (c) laying of protection layer, (d) fiber splicing, and (e) debugging the light circuit.
(a) |
(b) |
(c) |
(d) |
(e) |