Research Article
Study on Compaction Effect and Process of Reclaimed Soil of Nonmetallic Mines in Xinjiang, China
Table 7
Numerical simulation results for soil thickness of 50 cm.
| Compaction times | Maximum subsidence displacement of soil particles after compaction (cm) | Minimum porosity of numerical simulation | Porosity obtained by field compaction test | Difference | Depth 10 cm | Depth 30 cm | Depth 10 cm | Depth 30 cm | Depth 10 cm | Depth 30 cm |
| 1 | 2.4058 | 0.52 | 0.5197 | 0.5287 | 0.5207 | 0.0087 | 0.001 | 3 | 4.0208 | 0.49 | 0.5011 | 0.5187 | 0.5134 | 0.0287 | 0.0123 | 5 | 4.4194 | 0.484 | 0.50 | 0.5092 | 0.5097 | 0.0252 | 0.0097 |
|
|