Research Article

Study on Compaction Effect and Process of Reclaimed Soil of Nonmetallic Mines in Xinjiang, China

Table 8

Numerical simulation results for soil thickness 70 cm.

Compaction timesMaximum subsidence displacement of soil particles after compaction (cm)Minimum porosity of numerical simulationPorosity obtained by field compaction testDifference
Depth 10 cmDepth 30 cmDepth 10 cmDepth 30 cmDepth 10 cmDepth 30 cm

13.71470.5280.5250.53960.52680.00460.0018
35.42570.5020.5140.52230.52470.01230.0107
56.36310.4880.5080.51700.53090.0150.0229