Research Article
PC Cable-Stayed Bridge Main Girder Shear Lag Effects: Assessment of Single Cable Plane in Construction Stage
Figure 3
Installing the model: (a) installing four pairs of stay cables at Pier 4#, (b) closure of side span of Pier 5#, (c) second stage dead load applied by model, and (d) model exerts live load.
(a) |
(b) |
(c) |
(d) |