Study on the Bearing Capacity and Engineering Performance of Aeolian Sand
Table 4
Reinforcement methods for each area.
| Area | Reinforcement methods |
| 1 | One meter was filled with a stone cushion and 2 m of aeolian sand were replaced | 2 | Two meters of aeolian sand were replaced and a geogrid was added | 3 | One meter was filled with a stone cushion, 2 m of aeolian sand were replaced, and a geogrid was added | 4 | — | 5 | Two meters of aeolian sand were replaced | 6 | The silt was removed below 2 m, 2 m of gravel was filled, a geogrid was added, and then, aeolian sand was filled to the surface |
|
|