Research Article
Numerical Modelling of Clay Seal Maturation in Deep Boreholes with Nuclear Waste
Figure 2
Instrument in the laboratory test. (a) Setup with clay seals after maturation, with the top lid removed; (b) 96-hour laboratory experiment with clay plugs in perforated steel tubes surrounded by mud; (c) schematic illustration of test setup with clay seals (soft clay mud and dense clay blocks).
(a) |
(b) |
(c) |