Research Article

Effect of Clogging on the Permeability of Porous Asphalt Pavement

Table 5

Drainage decline of various void rates.

Void rate (%)CM (g)LV (ml/s)CV (ml/s)MDC (ml/s)DT (s)DCC

25045.4539.7180.7314.635.52
5036.5734.6577.6618.064.30
10035.6230.4473.1420.403.59
15032.6026.9764.5118.173.55
20015.621.4238.4013.402.87

23030.6426.0255.0416.713.29
5025.2422.5651.9919.862.62
10022.8620.2842.7224.351.75
15020.1520.8441.9425.611.64

20021.0213.3932.915.752.09
5018.7013.8931.6718.521.71
10016.706.7625.2416.131.56

18012.3710.2723.4013.811.69
5011.748.3920.3923.270.88

CM: clogging mass. LV: longitudinal velocity. CV: cross velocity. MDC: maximum drainage capacity. DT: drainage Time. DCC: drainage capacity coefficient.