Research Article
Effect of Clogging on the Permeability of Porous Asphalt Pavement
Table 5
Drainage decline of various void rates.
| Void rate (%) | CM (g) | LV (ml/s) | CV (ml/s) | MDC (ml/s) | DT (s) | DCC |
| 25 | 0 | 45.45 | 39.71 | 80.73 | 14.63 | 5.52 | 50 | 36.57 | 34.65 | 77.66 | 18.06 | 4.30 | 100 | 35.62 | 30.44 | 73.14 | 20.40 | 3.59 | 150 | 32.60 | 26.97 | 64.51 | 18.17 | 3.55 | 200 | 15.6 | 21.42 | 38.40 | 13.40 | 2.87 |
| 23 | 0 | 30.64 | 26.02 | 55.04 | 16.71 | 3.29 | 50 | 25.24 | 22.56 | 51.99 | 19.86 | 2.62 | 100 | 22.86 | 20.28 | 42.72 | 24.35 | 1.75 | 150 | 20.15 | 20.84 | 41.94 | 25.61 | 1.64 |
| 20 | 0 | 21.02 | 13.39 | 32.9 | 15.75 | 2.09 | 50 | 18.70 | 13.89 | 31.67 | 18.52 | 1.71 | 100 | 16.70 | 6.76 | 25.24 | 16.13 | 1.56 |
| 18 | 0 | 12.37 | 10.27 | 23.40 | 13.81 | 1.69 | 50 | 11.74 | 8.39 | 20.39 | 23.27 | 0.88 |
|
|
CM: clogging mass. LV: longitudinal velocity. CV: cross velocity. MDC: maximum drainage capacity. DT: drainage Time. DCC: drainage capacity coefficient.
|