Research Article

Corrosion Localization Analysis in T-Shape Pipe Junction Based on Multielectrode Current Measurements

Figure 3

The photo and the scheme of laboratory setup to model the operation of water supply system: 1: centrifugal pump; 2: electric water heater; 3: multielectrode unit of the T-shape junction; 4: valves; 5: flow meters; 6: water inlet; 7: water outlet.