Research Article
Model Tests on the Antibreaking Countermeasures for Tunnel Lining Across Stick-Slip Faults
Figure 6
Arrangement of testing section and measuring points. (a) The measuring section of operating conditions 1 to 3 (unit: mm). (b) The measuring section of operating conditions 4 to 5 (unit: mm). (c) Arrangement of the measuring points.
(a) |
(b) |
(c) |