Research Article
Rheological Properties Comparing Hot and Cold Bituminous Mastics Containing Jet Grouting Waste
Figure 5
Checking filler content: (a) calibration of the glass test tubes, (b) specimen ready for the centrifuge, (c) centrifuge equipment, and (d) residual filler.
(a) |
(b) |
(c) |
(d) |