Research Article

Theoretical and Numerical Research on V-Cut Parameters and Auxiliary Cuthole Criterion in Tunnelling

Table 9

Technical statistics of V-cut blasting with auxiliary holes.

DateVertical depth of hole (m)Cyclic advancement (m)Blasthole utilizing factor (%)Specific charge (kg/m3)

2019.3.184.74.2991.40.882
2019.3.194.74.2790.80.886
2019.3.204.74.2089.40.900
2019.3.214.74.2590.40.891
2019.3.224.74.2991.20.882
2019.3.234.74.2390.00.895
2019.3.244.74.2690.60.886
Average4.74.2690.50.889