Research Article

Calculation Method for the Critical Thickness of a Karst Cave Roof at the Bottom of a Socketed Pile

Figure 8

The process of constructing the physical model. (a) Pouring the similar material, (b) pre-burying the semicylinder, (c) installing the socketed pile, and (d) completing the physical model.
(a)
(b)
(c)
(d)