Research Article
Risk Identification and Assessment during the Excavation of the Deep Foundation Pit
| | Risk factors | Risk level | | I | II | III | IV | V |
| | Groundwater level (m) | 16–20 | 12–16 | 7–12 | 3–7 | 0–3 | | Stratum type | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Surrounding live load | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Surrounding heap load | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Overhead power | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Pile horizontal displacement (mm) | 0–6 | 6–12 | 12–18 | 18–24 | 24–36 | | Surface settlement (mm) | 0–8 | 8–16 | 16–24 | 24–32 | 32–40 | | Vertical displacement of pile top (mm) | 0–2.5 | 2.5–5 | 5–7.5 | 7.5–10 | 10–12.5 | | Horizontal displacement of pile top (mm) | 0–3 | 3–6 | 6–9 | 9–12 | 12–15 | | Support axial force (kN) | 0–800 | 800–1600 | 1600–2400 | 2400–3200 | 3200–4000 | | Pile strength | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Nontimely support | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Poor dewatering effect | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Poor drainage effect | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Overexcavation and underexcavation | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Management level | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 | | Management system | 80–100 | 60–80 | 40–60 | 20–40 | 0–20 |
|
|