Research Article

Application Calibration Based on Energy Consumption Model in Optimal Design of Green Buildings

Table 2

Load calculation table.

Load nameElectricity load (kW)Need factor (ke)Power factorActive power (kW)Reactive power (kvar)Inspecting power (kVA)

Illumination3.231.130.912.311.462.65
Air conditioning system19.661.431.5412.9612.1016.60
Weak current system9.011.271.395.134.526.71
Subtotal33.250.6419.3417.6723.11
Multiplied by the coefficient0.8917.0414.8721.65
After power factor compensation33.660.8817.127.9819.40