Research Article
Application Calibration Based on Energy Consumption Model in Optimal Design of Green Buildings
| Load name | Electricity load (kW) | Need factor (ke) | Power factor | Active power (kW) | Reactive power (kvar) | Inspecting power (kVA) |
| Illumination | 3.23 | 1.13 | 0.91 | 2.31 | 1.46 | 2.65 | Air conditioning system | 19.66 | 1.43 | 1.54 | 12.96 | 12.10 | 16.60 | Weak current system | 9.01 | 1.27 | 1.39 | 5.13 | 4.52 | 6.71 | Subtotal | 33.25 | 0.64 | — | 19.34 | 17.67 | 23.11 | Multiplied by the coefficient | — | 0.89 | — | 17.04 | 14.87 | 21.65 | After power factor compensation | 33.66 | — | 0.88 | 17.12 | 7.98 | 19.40 |
|
|