Research Article
Study on the Freeze-Thaw Problems in the Winter Construction of the Lianghekou Earth-Core Rockfill Dam and the Countermeasures for Prevention
Figure 5
On-site rolling and compacting test of gravelly soil during the winter construction process (a) and the frozen soil block that is difficult to compact (b).