Research Article

Study on the Freeze-Thaw Problems in the Winter Construction of the Lianghekou Earth-Core Rockfill Dam and the Countermeasures for Prevention

Table 3

Total filling volume of gravelly soil of the dam core wall during the winter construction.

Year201620172018

Total filling volume of gravelly soil (million m3)9.920.524.3