Research Article

The Master-Curve Band considering Measurement and Modeling Uncertainty for Bituminous Materials

Table 2

The confidence interval constructed for different bitumen using the GS model.

Bitumen typeConfidence level95%90%85%
LowerUpperLowerUpperLowerUpper

U15δ10.0910.3210.1210.2810.1310.27
α−11.37−10.59−11.24−10.72−11.21−10.75
λ3.523.663.553.643.553.63
β2.182.462.232.412.242.40
γ0.570.580.570.570.570.57

U70δ−7.06−5.33−6.92−5.47−6.83−5.56
α13.0614.3813.1714.2713.2414.20
λ2.574.372.714.232.814.13
β0.000.140.010.120.010.12
γ−0.56−0.42−0.55−0.43−0.54−0.44

SBSδ0.961.150.981.130.991.12
α6.166.566.196.536.216.51
λ0.620.690.630.690.630.68
β0.150.200.150.200.160.20
γ−0.42−0.38−0.41−0.38−0.41−0.38