Research Article

Comparative Study on Grouting Protection Schemes for Shield Tunneling to Adjacent Viaduct Piles

Figure 14

Longitudinal displacement of the pile along the tunnel: (a) 10 rings before arriving at the pile; (b) 8 rings before arriving at the pile.
(a)
(b)