Research Article
Comparative Study on Grouting Protection Schemes for Shield Tunneling to Adjacent Viaduct Piles
Figure 14
Longitudinal displacement of the pile along the tunnel: (a) 10 rings before arriving at the pile; (b) 8 rings before arriving at the pile.
(a) |
(b) |