Research Article
Comparative Study on Grouting Protection Schemes for Shield Tunneling to Adjacent Viaduct Piles
Figure 21
Longitudinal displacement of the pile along tunnel: (a) 6 rings before arriving at the pile; (b) 4 rings before arriving at the pile.
| (a) |
| (b) |