Research Article

Comparative Study on Grouting Protection Schemes for Shield Tunneling to Adjacent Viaduct Piles

Figure 22

Longitudinal displacement of the pile along tunnel: (a) 2 rings before arriving at the pile; (b) arriving at the pile.
(a)
(b)