Research Article

Comparative Study on Grouting Protection Schemes for Shield Tunneling to Adjacent Viaduct Piles

Figure 7

Vertical displacement of the pile: (a) 2 rings before arriving at the pile; (b) arriving at the pile.
(a)
(b)