Research Article
Study on the Hydro-Thermal-Mechanical Characteristics of the Lime-Soil Compaction Pile in the Forming Process
Figure 1
The field test. (a) Mixing lime soil. (b) Lime soil by using the hammer. (c) Sensor in the hole. (d) Sensor layout. (e) Layout plan of the pile top. (f) Test site after levelling.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |