Research Article
Mechanical Responses to Different Excavation Methods of Qichongcun Tunnel in Guiyang City, China
Table 4
Main calculation steps of single-side wall construction.
| Calculation step | Construction conditions |
| I.S. | Clear the displacement | S1 | Excavate 1 m of the tunnel guide pit | S2 | Excavate 1 m of the tunnel guide pit; make the first step of the steel arch and initial lining | S3 | Excavate 1 m of the tunnel guide pit; make the second step of the steel arch and initial lining | S4 | Excavate 1 m of the tunnel guide pit; make the third step of the steel arch and initial lining | S5 | Excavate 1 m of the tunnel guide pit; make the fourth step of the steel arch and initial lining | S6 | Excavate 1 m of the tunnel guide pit; make the fifth step of the steel arch and initial lining | S7 | Excavate 1 m of the tunnel guide pit; make the sixth step of the steel arch and initial lining | S8 | Excavate 1 m of the tunnel guide pit; make the seventh step of the steel arch and initial lining | S9 | Excavate 1 m of the tunnel guide pit; make the eighth step of the steel arch and initial lining | S10 | Excavate 1 m of the tunnel guide pit; make the ninth step of the steel arch and initial lining | S11 | Excavate 1 m of the first step of the main tunnel; make the tenth step of the steel arch and initial lining | S12 | Excavate 1 m of the first step of the main tunnel; make the steel arch and initial lining of the previous step | S13 | Excavate 1 m of the second step of the main tunnel; make the steel arch and initial lining of the previous step | S14 | Make steel arch and initial lining of the previous step | S15 | Excavate 1 m of the third step of the main tunnel; make steel arch and initial lining of the previous step | ... | ... | S26 | Excavate inverted arch | S27 | Lay steel for inverted arch | S28 | Inverted arch | S29 | Second lining |
|
|