Research Article
Mechanical Responses to Different Excavation Methods of Qichongcun Tunnel in Guiyang City, China
Table 5
Main calculation steps of the three-step method.
| Calculation step | Construction conditions |
| I.S. | Clear the displacement | S1 | Excavate the first 1 m of the tunnel for anchor and lining | S2 | Excavate 1 m of the first step and the second step for the steel arch and lining | S3 | The first step, the second, and third steps are 1 m each for anchor the steel arch and lining | S4 | Excavate 1 m of the first, second, and third steps and make the steel arch and initial lining | S5 | Repeat the previous step | S6 | Repeat the previous step | S7 | Repeat the previous step | S8 | Repeat the previous step | ... | ... | S14 | Excavate inverted arch | S15 | Lay steel for inverted arch | S16 | Inverted arch | S17 | Second lining |
|
|