Research Article
Study on Engineering Performance of Green Porous Sponge Ecological Concrete
Figure 5
Temperature variation curve at different times on different days. (a) Temperature variation of porous sponge ecological concrete on the 1st day. (b) Temperature variation of porous sponge ecological concrete on the 2nd day. (c) Temperature variation of porous sponge ecological concrete on the 3rd day. (d) Temperature variation of porous sponge ecological concrete on the 4th day. (e) Temperature variation of porous sponge ecological concrete on the 5th day.
(a) |
(b) |
(c) |
(d) |
(e) |