Research Article

Hydraulic Erosion Rate of Reinforced Tailings: Laboratory Investigation and Prediction Model

Table 4

Experimental data of tailings erosion with the reinforcement spacing of 1.3 cm.

Geospacing (cm)Sample numberFlow rate Q (m3/h)Flow velocity (m/s)Erosion time t (s)Erosion height (mm)Erosion rate (mm/s)

1.3112.10.8401204.70.039
23.80.2641204.50.038
33.80.2641203.70.031
43.80.2641205.00.042
53.80.2641205.80.048
63.80.2641206.00.050
73.80.2641204.20.035
83.80.2641204.00.033