Research Article

Design and Performance of Ultrathin Overlay Epoxy-Rubber Concrete

Table 3

Secant slope variation.

Rubber powder replacement rate (%)Tapped porosity secant slope
SlopeRate of change (%)

0–100.048
10–300.01764.6
30–500.03394.1
50–700.266704.5
70–900.20523.0