Research Article
Design and Performance of Ultrathin Overlay Epoxy-Rubber Concrete
| Rubber powder replacement rate (%) | Tapped porosity secant slope | Slope | Rate of change (%) |
| 0–10 | 0.048 | — | 10–30 | 0.017 | 64.6 | 30–50 | 0.033 | 94.1 | 50–70 | 0.266 | 704.5 | 70–90 | 0.205 | 23.0 |
|
|