Influence of Utility Tunnel on the Lower Part of the Existing Double-Track Shield Tunnel in Loess Soil

Figure 7

The vertical displacement of each monitoring points of each case when H/D is 3. (a) Working condition 1 (I/D = 3) vertical displacement of monitoring point. (b) Working condition 5 (I/D = 5) vertical displacement of monitoring point.