Research Article
Influence of Utility Tunnel on the Lower Part of the Existing Double-Track Shield Tunnel in Loess Soil
Figure 8
The vertical displacement of each monitoring point of each case when H/D is 5. (a) Working condition 21 (I/D = 2.5) vertical displacement of monitoring point. (b) Working condition 26 (I/D = 5) vertical displacement of monitoring point.
(a) |
(b) |