Research Article

Influence of Utility Tunnel on the Lower Part of the Existing Double-Track Shield Tunnel in Loess Soil

Table 1

Model working condition statistics.

ConditionH/DI/D

133
233.5
334
434.5
535
63.53
73.53.5
83.54
93.54.5
103.55
1143
1243.5
1344
1444.5
1545
164.53
174.53.5
184.54
194.54.5
204.55
2152.5
2253
2353.5
2454
2554.5
2655