Table 3

Parameters of structures of metro tunnel and utility tunnel.

NameBulk density (kN/m3)Elasticity modulus (MPa)Poisson’s ratioThickness (m)

Shield463.842.10E + 050.300.04
Segment252.84E + 040.200.3
Grouting (early)230.90.30
Grouting (late)234000.2
Soil-nailed wall222.18E + 040.2
Soil nailing78.52.00E + 050.3
Cushion232.60E + 040.2
Corridor253.15E + 040.2

“—” means that the grouting layer completely fills the gap at the shield tail, without a fixed thickness.