| Name | Bulk density (kN/m3) | Elasticity modulus (MPa) | Poisson’s ratio | Thickness (m) |
| Shield | 463.84 | 2.10E + 05 | 0.30 | 0.04 | Segment | 25 | 2.84E + 04 | 0.20 | 0.3 | Grouting (early) | 23 | 0.9 | 0.30 | — | Grouting (late) | 23 | 400 | 0.2 | — | Soil-nailed wall | 22 | 2.18E + 04 | 0.2 | | Soil nailing | 78.5 | 2.00E + 05 | 0.3 | | Cushion | 23 | 2.60E + 04 | 0.2 | | Corridor | 25 | 3.15E + 04 | 0.2 | |
|
|
“—” means that the grouting layer completely fills the gap at the shield tail, without a fixed thickness.
|