Parameters of structures of metro tunnel and utility tunnel.
| | 
 |  | Name | Bulk density (kN/m3) | Elasticity modulus (MPa) | Poisson’s ratio | Thickness (m) |  | 
 |  | Shield | 463.84 | 2.10E + 05 | 0.30 | 0.04 |  | Segment | 25 | 2.84E + 04 | 0.20 | 0.3 |  | Grouting (early) | 23 | 0.9 | 0.30 | — |  | Grouting (late) | 23 | 400 | 0.2 | — |  | Soil-nailed wall | 22 | 2.18E + 04 | 0.2 |  |  | Soil nailing | 78.5 | 2.00E + 05 | 0.3 |  |  | Cushion | 23 | 2.60E + 04 | 0.2 |  |  | Corridor | 25 | 3.15E + 04 | 0.2 |  |  | 
 | 
 | 
| “—” means that the grouting layer completely fills the gap at the shield tail, without a fixed thickness.
 |