Research Article

Bond Slip Behavior of Grout-Filled Concrete Members with Different Interface Materials

Figure 2

Specimen preparation, (a) Pour concrete, (b) Clean inside space, (c) Un-grouted specimen, (d) Grouted specimen.
(a)
(b)
(c)
(d)