Research Article

Analysis of Multifactor Influence Model on Energy Dissipation Rate of Rough-Strips Energy Dissipator in the Spillway Bend

Table 4

Orthogonal test results.

Test no.B/(m)hL/(m)θ/(rad)∆L/(m)1/Re (×10−5)1/Fr2/(−)η/(%)k/(−)

10.500.0120.3140.183.410.5720.830.020
20.600.0120.3840.243.400.6126.370.019
30.800.0120.4540.303.770.6238.940.017
40.600.0150.3140.183.140.5728.210.025
50.800.0150.3840.244.600.6544.830.023
60.500.0150.4540.303.090.5920.910.022
70.800.0180.3840.184.250.4930.480.037
80.500.0180.4540.242.800.6327.980.033
90.600.0180.3140.303.760.6144.300.018
100.600.0120.4540.183.410.5933.640.029
110.800.0120.3140.243.830.5426.170.015
120.500.0120.3840.303.300.6828.010.015
130.500.0150.3840.182.780.6433.950.031
140.600.0150.4540.243.790.5826.210.027
150.800.0150.3140.304.150.6235.380.015
160.800.0180.4540.184.600.6640.780.043
170.500.0180.3140.243.030.6435.390.023
180.600.0180.3840.303.170.5422.200.022