Research Article
Study on the Mechanical Properties and Design Parameters of Floor Slabs Waste Subgrade Filler
Figure 11
Construction process of the FSW subgrade: (a) roughly leveling with a bulldozer; (b) watering with a sprinkler; (c) static compaction and weak vibration.
| (a) |
| (b) |
| (c) |