Research Article

Evaluation on Distribution Characteristics of Pore Water Pressure within Saturated Pavement Structure Based on the Proposed Tire-Fluid-Pavement Coupling Model

Figure 11

Water film thickness: (a) 1 mm; (b) 2 mm; (c) 5 mm; (d) 8 mm; (e) 10 mm.
(a)
(b)
(c)
(d)
(e)