Research Article

An Investigation on the Influences of Construction Schemes on Backfilling the River-Crossing Section of a Utility Tunnel

Figure 2

Backfill process. (a) Before backfilling of the integrated pipe corridor. (b) After backfilling of the integrated pipe corridor. (c) After backfilling of the integrated pipe corridor pit.
(a)
(b)
(c)