Research Article
An Investigation on the Influences of Construction Schemes on Backfilling the River-Crossing Section of a Utility Tunnel
Figure 2
Backfill process. (a) Before backfilling of the integrated pipe corridor. (b) After backfilling of the integrated pipe corridor. (c) After backfilling of the integrated pipe corridor pit.
(a) |
(b) |
(c) |