Research Article
An Investigation on the Influences of Construction Schemes on Backfilling the River-Crossing Section of a Utility Tunnel
Figure 25
Change of backfilling stress of roadbed and water-stable layer. (a) Road base backfill. (b) Backfilling of water-stable pavement. (c) Consider the effect of river pressure.
(a) |
(b) |
(c) |