Research Article

An Investigation on the Influences of Construction Schemes on Backfilling the River-Crossing Section of a Utility Tunnel

Figure 25

Change of backfilling stress of roadbed and water-stable layer. (a) Road base backfill. (b) Backfilling of water-stable pavement. (c) Consider the effect of river pressure.
(a)
(b)
(c)