Research Article

Study on Evaluation Theory of Bridge Damage State and Methodology on Early Warning of Danger

Table 2

Comparison of FAR and WT among methods I, II, and III.

Test no.Method IMethod IIMethod III
FAR (%)WT (min)FAR (%)WT (min)FAR (%)WT (min)

12.18.3410.720.4511.424.77
22.47.9811.020.4712.029.03
31.97.889.722.0110.826.74
41.79.019.923.1410.525.64
52.08.4511.525.1612.423.33