Research Article
[Retracted] Optimization Method of High-Speed Train Composite Material Workshop Planning and Scheduling
Table 2
Average efficiency of each station.
| Scheme/average efficiency of each station | Average work rate (%) | Average idle rate (%) | Average blocking rate (%) |
| Scheme 1 | 61.78 | 30.63 | 7.60 | Scheme 2 | 60.68 | 31.24 | 8.09 | Scheme 3 | 59.55 | 31.94 | 8.61 |
|
|