Research Article
Study of Problems Related to Laying Ballastless Track in the Turnout of Ballasted Track at High-Speed Railway Stations
Table 6
Post-construction settlements (mm).
  |  | Mileage | Prediction model | Current settlement | Final settlement | Post-construction settlement |  
  |  | DK84 + 771 | D-H-V | 6.1 | 6.44 | 0.34 |  | DK84 + 821 | D-H-V | 13.48 | 14.44 | 0.96 |  | DK123 + 960 | D-H-V | 3.90 | 3.93 | 0.03 |  
  |  
  |