Research Article

Study on the Mechanical Response of a Dense Pipeline Adjacent to the Shallow Tunnel

Figure 11

Comparison between actual monitoring curve and calculation curve of settlement value of each pipeline: (a) PVC communication cable; (b) cast iron pipe for water; (c) concrete sewage pipe; (d) concrete rainwater pipe.
(a)
(b)
(c)
(d)